Starting to lay the floor

Friday, 11 February 2022

Foundations and main hall floor

The foundations for the small hall and cafe area are being poured, and the block & beam floor of the main hall is just starting to be installed.

Block and beam floor

Block and beam is a method of installing a solid floor using pre-stressed concrete beams infilled with blocks. This reduces the installation time and produces a very strong and durable base for the whole building.